Aerial View of Griggs

Contact Info Department of Public Utilities
Contact Directory

Walk-in Payment Office:
Temporarily Closed

After-hours Drop Box Available: 
111 N. Front Street
Columbus, Ohio 43215
Free short-term Parking
(garage across Long St) 
Directions
Public Utilities Customer Service Phone:
614-645-8276
Weekdays 7 am - 6 pm
Email: 
utilityleadrep@columbus.gov 


PUBLIC UTILITIES:



MOST REQUESTED:

BILL RELATED LINKS:

Receive Public Utilities Emails

Sign Up Through GovDelivery

GovDeliveryBubble

Large capital improvement projects (CIPs) currently underway in support of Blueprint

Blueprint Near South Lining Project

Blueprint Near South Lining Project In the South Side planning area bounded by Markison Avenue, Wall Street, Refugee Road, and Fairwood Avenue, this project will begin in winter 2020 to rehabilitate existing sanitary sewer mains and associated manholes. Area residents will receive notice before the work begins with info on timing, contacts, and a request to restrict water usage for a short time. - learn more

Linden Area Map C1

Blueprint Linden Green Infrastructure Projects Blueprint Columbus expands into the Linden area to reduce sanitary sewer overflows through improving current infrastructure, repurposing abandoned properties for stormwater control and adding green infrastructure in neighborhoods. - learn more

Blueprint Clintonville Green Infrastructure Projects

Blueprint Clintonville Green Infrastructure Projects Blueprint Columbus expands into the Clintonville area to reduce sewer overflow into Adena Brook in Whetstone Park by using green infrastructure. Homes in the Clintonville project area are connected to a city sanitary sewer that contributes to those overflows. - learn more

Blueprint Clintonville 1 – Roof Redirection – Blenhemim/Glencoe Phase 2

Blueprint Clintonville 1 – Roof Redirection – Blenhemim/Glencoe Phase 2 Roof drains will be redirected away from house foundations to the curb or other suitable outlet from 493 homes in the project area to reduce stormwater from entering the sanitary sewer system. Construction is to begin in first quarter of 2021 and be complete by first quarter, 2022. Area residents will receive written notification prior to the work. The affected area is bounded by Acton Road, Granden Road and Indianola Avenue, Glencoe Road and High Street.   - learn more

Blueprint Clintonville: Blenheim Glencoe Area 1 Roof Re-Direct Project

Blueprint Clintonville: Blenheim Glencoe Area 1 Roof Re-Direct Project In this project, roof drains will be redirected away from house foundations to the curb or other suitable outlet, reducing stormwater from entering the sanitary sewer system. Construction is expected to begin in second quarter of 2020 and complete by summer, 2021. - learn more

Blueprint Clintonville: Blenheim/Glencoe LL Area Map

Blueprint Clintonville: Blenheim/Glencoe - Lateral Lining This project will rehabilitate sanitary sewer service laterals, reducing the stormwater entering the sanitary sewer system through leaky joints and cracks in lateral pipes. Construction is expected to begin in first quarter of 2020 and complete by June, 2022. - learn more

Blueprint Clintonville 3: Lining Project The goal of this project is to reduce the amount of inflow and infiltration of non-sewerage waters to the sanitary sewer system reducing basement backups and sewerage overflows to area streams and rivers. The project includes over 11,000 linear feet of 8-inch to 24-inch diameter sewers and 40 manholes. Construction is expected to begin in fall 2018. - learn more

Blueprint Clintonville: Cooke/Glenmont Area – Lateral Lining and Downspout Redirection Projects This project will rehabilitate sanitary sewer service laterals in the project area via “trenchless” methods using cured-in-place pipe (CIPP) technology and redirect existing downspouts away from residential structures to better facilitate property drainage. Construction is expected to begin early 2019. - learn more

Blueprint Clintonville: Morse/Dominion Area – Lateral Lining and Downspout Redirection Projects This project will rehabilitate sanitary sewer service laterals in the project area via “trenchless” methods using cured-in-place pipe (CIPP) technology and redirect existing downspouts away from residential structures to better facilitate property drainage. Construction is expected to begin in 3rd quarter 2018.   - learn more

Blueprint Clintonville: Overbrook/Chatham Area – Lateral Lining and Downspout Redirection Projects This project will rehabilitate sanitary sewer service laterals in the project area and redirect existing downspouts away from residential structures to better facilitate property drainage. This will reduce the amount of stormwater entering the sanitary sewer system through leaky joints and cracks in lateral pipes, and from foundation drains connected to the sanitary laterals. - learn more

Blueprint Clintonville: Schreyer/ Springs Area Lateral Lining and Downspout Redirection Projects This project will rehabilitate all sanitary sewer service laterals in the project area via “trenchless” methods using cured-in-place pipe (CIPP) technology.  The Downspout Redirection project will redirect roof drain downspouts away from residential structures. Construction is expected to begin in First Quarter 2019.   - learn more

Blueprint Clintonville: Weisheimer/Indian Springs Area – Lateral Lining and Downspout Redirection Projects This project will rehabilitate sanitary sewer service laterals in the project area via “trenchless” methods using cured-in-place pipe (CIPP) technology and redirect existing downspouts away from residential structures to better facilitate property drainage. Construction is expected to begin in the fall of 2018. - learn more

Blueprint Clintonville: Weisheimer/Indian Springs Area-Bioretention Improvements With a cost of approximately $2.5 million, this project will provide construct curb bump outs and rain gardens. The goal is to provide detention and water quality improvement to rain water that will be redirected from the sanitary sewer system by future Blueprint projects. Construction is expected to begin in the second quarter of 2017. - learn more

Blueprint Clintonville: Weisheimer/Indian Springs Area-Permeable Pavement With a cost of approximately $3.5 million, this project will replace the existing asphalt pavement with permeable pavers to provide detention and water quality improvement to rain water that will be redirected from the sanitary sewer system by future Blueprint projects. Construction is expected to begin in the first quarter of 2017. 
- learn more

Blueprint Fifth by Northwest: Lining Project Rehabilitating existing sanitary sewer mains and associated manholes in the Blueprint Fifth by Northwest project area will reduce occurrences of water in basements and sewerage overflows to area streams and rivers. Construction is expected to begin in fall 2017. - learn more

Blueprint Hilltop: Lining Project This project will rehabilitate existing sanitary sewer mains and associated manholes in the Hilltop planning area to reduce occurrences of water in basements and sewerage overflows to area streams and rivers. The estimated construction cost is approximately $6 million and is expected to begin in fall 2016.  - learn more

Blueprint Hilltop 4: Lining Project This project will rehabilitate existing sanitary sewer mains and associated manholes in the Blueprint Hilltop 4 project area to reduce occurrences of water in basements and sewerage overflows to area streams and rivers. Construction is expected to begin in fall 2017. - learn more

Blueprint West Franklinton: Lining Project This project will rehabilitate existing sanitary sewer mains and associated manholes in the Blueprint West Franklinton project area. It will reduce inflow and infiltration of non-sewerage waters to the sanitary sewer system, reducing occurrences of water in basements and sewerage overflows to area streams and rivers. Construction is expected to begin in fall 2017. - learn more