Arterial Street Rehabilitation - Avery Road Widening

This project will reconstruct and widen Avery Road from the CSX railroad tracks to a point determined in design as needed to tie-in near the south end of the Tuttle Crossing Boulevard project. The reconstructed roadway will be converted to a curb and gutter section with the addition of a 10’ wide shared use path along the east side, sidewalk along the west side, street lighting, and street trees. The anticipated lane configuration is two through lanes in each direction with a two-way left turn lane or dedicated left turns at intersections. The final traffic control configuration will be determined via traffic analysis.

South of the railroad tracks, the existing roadway section is not anticipated to be modified with the exception of lane control modifications. Sidewalk will be extended south of the railroad tracks to Winters Run Road. Other complete street improvements south of the tracks will be determined in design following coordination with City of Hilliard and Franklin County.

The project is also anticipated to include a waterline extension along Avery Road, limits to be determined.

Estimated Costs:                                                   
Design: $350,000
Right-of-way acquisition: TBD
Construction: TBD

Tentative Schedule:
Design: Winter 2019 – Spring 2021
Right-of-way acquisition: TBD
Construction: TBD

Contact Information:
City of Columbus Design Project Manager: Kyle Hardy, tel. (614) 645-2732
Designer: Stantec, Inc
Construction Contractor: TBD