Little Turtle Way - Roadway Improvement Project

Project Scope: This project will include roadway improvements to Little Turtle Way which will help improve traffic and mobility and reduce congestion, these include combining separated northbound and southbound lanes of Little Turtle Way into a unified two-way roadway between Blue Jacket Rd and the westbound ramp at SR 161, upgrading the intersection of Little Turtle Way and Longrifle Road to a modern roundabout, and installing sidewalk along the west side and a shared- use path along the east side of Little Turtle way between Blue Jacket Road and the westbound ramp art SR 161. 

Estimated Costs:

  • Design: $350,000
  • Right-of-Way Acquisition: $300,000
  • Construction: $3.2 million

Current Status: Feasibility Study

 Schedule:

  • Study: Scheduled to finish fall 2019
  • Design: Scheduled to finish in Summer 2020
  • Right of way: Finish acquisition summer 2020
  • Construction: Begin Fall 2020

Contact Information:

  • Design Project Manager:  Kevin Thomas tel (614) 645-6470
  • Designer: Carpenter Marty Transportation, Inc.
  • Contractor:  To Be Determined