Project Scope:
This project consists of the widening of Georgesville Road to provide a southbound right turn lane onto Hall Road, widening of Hall Road to provide an eastbound right turn lane onto Georgesville Road, constructing a Shared Use Path along the south side of Hall Road between Durrow drive/Georgesville Green Drive to Georgesville Road, and the full reconstruction of the traffic signal at the intersection of Georgesville Road and Hall Road.


Estimated Costs:

  • Design: $580,000
  • Right-of-Way Acquisition: $230,000
  • Construction: $1,600,000


Current Status: In Design


Schedule:

  • Design:  Scheduled to finish in Spring 2022
  • Right of way: Finish acquisition in Spring 2023
  • Construction:  Begin spring 2023


Contact Information:

  • Design Project Manager:  Kevin Thomas tel (614) 645-6470
  • Designer:  Mead and Hunt
  • Contractor: To Be Determined