Project Scope: This
project consists of the widening of Georgesville Road to provide a southbound
right turn lane onto Hall Road, widening of Hall Road to provide an eastbound
right turn lane onto Georgesville Road, constructing a Shared Use Path along
the south side of Hall Road between Durrow drive/Georgesville Green Drive to
Georgesville Road, and the full reconstruction of the traffic signal at the
intersection of Georgesville Road and Hall Road.
Estimated Costs:
- Design: $580,000
- Right-of-Way
Acquisition: $230,000
- Construction: $1,600,000
Current Status: In
Design
Schedule:
- Design:
Scheduled to finish in Spring 2022
- Right of way: Finish
acquisition in Spring 2023
- Construction:
Begin spring 2023
Contact Information:
- Design Project
Manager: Kevin Thomas tel (614) 645-6470
- Designer: Mead
and Hunt
- Contractor: To Be