Sinclear Rd - Culvert

Project Scope: This project will install new sidewalk along both sides of Sinclair Road from Morse Road to Strimple Avenue.  The project will also replace the culvert over Bill Moose Run.  The culvert will be designed and replaced first while the sidewalk is designed.  The sidewalk will be installed once the remaining design work is complete.

Estimated Costs:

  • Design: $420,000
  • Right-of-Way Acquisition: $210,000
  • Construction: $2.7 million

Current Status: in Design

 Schedule:

  • Culvert Design:  Completed summer 2019
  • Culvert Right of way: Completed summer 2019
  • Culvert Construction:  Begin summer 2019
  • Sidewalk Design Scheduled to finish in spring of 2020
  • Sidewalk Right of Way: Finish acquisition summer 2020
  • Sidewalk Construction: Begin Spring 2021

Contact Information:

  • Design Project Manager:  Kevin Thomas tel (614) 645-6470
  • Designer:  Dynotec
  • Culvert Contractor: Complete General