Operation Sidewalks - School Sidewalks - Hilltop (Olive St & Floral Ave)

Project Scope: This project scope consists of constructing sidewalks along the south side of Olive Street from Powell Avenue to Harris Avenue, the north side of Olive from Harris to Wayne Avenue, and on the south side of Floral Avenue from Oakley Avenue to Highland Avenue. Installation of the sidewalk will include curb ramps and drive approaches and may include curb, curb walls, and stormwater drainage improvements in select areas.  

Estimated Costs:

  • Design: $270,670
  • Right-of-Way Acquisition: $90,000
  • Construction: $1.2 million

Current Status: In Design

 Schedule:

  • Design:  Scheduled to finish in Summer 2021
  • Right of way: Finish acquisition Fall 2021
  • Construction:  Begin spring 2022

Contact Information:

  • Design Project Manager:  Kevin Thomas tel (614) 645-6470
  • Designer:  Korda
  • Contractor: To Be Determined