Olive Street & Floral Ave Sidewalks

 

Operation Sidewalks – School Sidewalks – Hilltop (Olive Street and Floral Avenue)

 


Project Scope:


This project scope consists of constructing sidewalks along the south side of Olive Street from Powell Avenue to Harris Avenue, the north side of Olive from Harris to Wayne Avenue, and on the south side of Floral Avenue from Oakley Avenue to Highland Avenue. Installation of the sidewalk will include curb ramps and drive approaches and may include curb, curb walls, and stormwater drainage improvements in select areas.  

 


Estimated Costs:

 

  • Design: $270,670
  • Right-of-Way Acquisition: $90,000
  • Construction: $1.5 million

 


Current Status
: In Design

 


Schedule:

 

  • Design:  Scheduled to finish in Spring 2022
  • Right of way: Finish acquisition Spring 2023
  • Construction:  Begin spring 2023

 

Contact Information:

 

  • Design Project Manager:  Kevin Thomas tel (614) 645-6470
  • Designer:  Korda
  • Contractor: To Be Determined