Design and Construction

Contact Information Department of Public Service
111 N. Front Street
Columbus, OH 43215
Office :  (614) 645-3111 
Fax :  (614) 645-7805 
Email : Contact Information

311
(614) 645-3111

UIRF - PID 105732

DESCRIPTION AND BENEFITS:

Cassady Avenue improvements consist of the full reconstruction of the roadway to a 3-lane, curb and gutter section with additional turn lanes at the intersection with E. 5th Avenue. Sidewalk will be placed along the east side and a shared use path along the west side. Additional improvements include traffic signal replacement, street lighting, street trees where feasible, and storm sewer. Electric distribution and water line systems are anticipated to be impacted.  The 12" water line between Avalon Place and E. 5th Avenue will be replaced with a new 12" line.

E. 5th Avenue improvements consist of roadway reconstruction with additional turn lanes at the intersection with Cassady Avenue. The sidewalk will be replaced along both sides and lighting and utility systems replaced/relocated as necessary. Additional improvements include street lighting, street trees where feasible, and storm sewer. Electric distribution and water line systems are anticipated to be impacted. The water services from the existing 2" water line between N. Dawson Avenue and Northview Avenue will be transferred to the existing 12" water line and the 2" line abandoned.

ESTIMATED SCHEDULE:

 

PHASESTARTFINISH
Study Spring 2018 Spring 2020
Design Spring 2020 Spring 2023
Right-of-Way Fall 2022 Spring 2024
Utility Relocations Fall 2023 Early 2024
Construction Mid 2024* Early 2026*

*Subject to funding approval by City Council and weather conditions


ESTIMATED COSTS:

PHASECOST
Study $530,000.00
Design $1.3 million
Right-of-Way $2.2 million
Utility Relocations $200,000
Construction $9.4 million


CONTACT INFORMATION:

City of Columbus Design Project Manager Kevin Thomas, P.E., (614) 645-6470
Designer Woolpert
Construction contractor To be determined