Worthington Woods Blvd Shared Use Path - Sancus Blvd to Park Road
Worthington Woods Blvd Shared Use Path - Sancus Blvd to Park Road
DESCRIPTION AND
BENEFITS:
This project consists of approximately 7,700
feet of shared use path on the south/east side of Worthington Woods Boulevard
from Sancus Boulevard to Park Road and along the south side of Park Road from
Worthington Woods Blvd to Deer Creek Dr (northern intersection). In addition,
sidewalk will be installed on the north side of Park Road from Worthington
Woods Blvd to Deer Creek Drive. Curb and gutter will be installed as
needed where the available space between the edge of pavement and right-of-way
does not allow for an open drainage system and SUP or sidewalk installation.
Storm sewer facilities will also be installed in conjunction with the curb
addition.
ESTIMATED SCHEDULE:
Design: Spring 2020 – Spring 2022
Right-of-way acquisition: Winter 2021 – Winter
2022
Construction: Spring
2023
ESTIMATED COSTS:
Design: $404,000
Right-of-way acquisition: $400,000
Construction: $3.7 million
CONTACT INFORMATION:
City of Columbus design project manager: Kevin Thomas, P.E., (614) 645-6470
Designer: Strand Associates, Inc.
Construction contractor: To be determined