Bikeway Development
DESCRIPTION
AND BENEFITS:
This project will add shared-use path along
the south side of Tussing Road from Brice Road to Hines Road. Enhanced
pedestrian crossings will be provided at Americana Parkway (west intersection)
and at the Tussing Elementary School. Sidewalk will be added on the north side
of Tussing Road between John Steven Way and Penobscot Boulevard to facilitate
access to the enhanced pedestrian crossings.
ESTIMATED
SCHEDULE:
PHASE | START | FINISH |
Design |
Summer 2021
|
Summer 2023
|
Right-of-Way |
Spring 2023
|
Fall 2024
|
Construction |
Early 2025*
|
Late 2025*
|
*Subject to funding approval by City Council
and weather conditions
ESTIMATED
COSTS:
PHASE | COST |
Design |
$700,000
|
Right-of-Way |
$250,000
|
Construction |
$3.7 million
|
CONTACT
INFORMATION:
City of Columbus
Design Project Manager |
S. Eric Lambert, P.E., (614) 645-2732
|
Designer |
Dynotec, Inc.
|
Construction
contractor |
To be determined
|