Hamilton Road (North) Phase C Widening - Dublin Granville Road to Central College Road

DESCRIPTION AND BENEFITS:

This project will widen Hamilton Road from SR161 to Central College Road and install roundabouts along Hamilton Road at Heathland Lane/Walton Breck Way and at Warner Road. The project will also include a shared-use path to be installed on the east side of Hamilton Road from Dublin-Granville Road to Central College Road, with a sidewalk on the west side of Hamilton Road from Dublin-Granville Road to Central College Road. Additionally, the project will include street lighting and associated stormwater drainage improvements

ESTIMATED SCHEDULE:

PHASESTARTFINISH
Study Summer 2020 Early 2023
Design Spring 2023 Summer 2024
Right-of-Way Spring 2024 Spring 2025
Utility Relocations Late 2023 Spring 2025
Construction Summer 2025* Late 2026*


ESTIMATED COSTS:

PHASECOST
Study $500,000
Design $1.3 Million
Right-of-Way $200,000
Construction $19.1 Million



CONTACT INFORMATION:

City of Columbus Design Project Manager: S. Eric Lambert, P.E., (614) 645-2732
Designer: American Structurepoint
Construction contractor: To be determined

VIRTUAL PUBLIC MEETING

A Virtual Public Meeting was held March 3, 2022 from 5:30-6:30 pm. A link to the WebEx Event recording can be found here.

The PowerPoint presentation that was shared at the public meeting can be found at the link below:
Hamilton Road Improvements – SR 161 to Central College Road – Public Meeting PowerPoint Presentation

 

The comment period will be open for 30 days, until April 4th, 2022. You can comment directly through the link below:

https://survey.alchemer.com/s3/6756515/Hamilton-Road-Improvements