Courtright Road Sidewalks – Refugee Road to Groves Road
DESCRIPTION
AND BENEFITS:
This project consists of installing new
sidewalk along both sides of Courtright Road between Refugee Road and Groves
Road to fill gaps within the pedestrian network. Sidewalk limits will be
generally from Refugee Road to Westpoint Drive and from Courtright Lane (a
private road) to Groves Road. Curb and storm sewer will be installed as needed.
ESTIMATED
SCHEDULE:
PHASE
|
START
|
FINISH
|
Design
|
Spring 2021
|
Spring 2023
|
Right-of-Way
|
Fall 2022
|
Late 2023
|
Construction
|
Early 2024*
|
Late 2024*
|
*Subject to funding approval by City Council
and weather conditions
ESTIMATED
COSTS:
PHASE
|
COST
|
Design
|
$400,000
|
Right-of-Way
|
$100,000
|
Construction
|
$1.8 million
|
CONTACT
INFORMATION:
City of Columbus
Design Project Manager
|
Steve Schmidt, P.E., (614) 645-3966
|
Designer
|
Ribway Engineering Group Inc.
|
Construction
contractor
|
To be determined
|