SR 161 at Huntley Road/Sinclair Road Signal Replacement
Dublin-Granville Road at Huntly/Sinclair Road
Project Scope: This project scope consists of replacing the existing traffic signal at the intersection of Dublin‐Granville Road and Huntley Road/Sinclair Road with a new span wire traffic signal. The intersection will be upgraded to full ADA compliance with new curb ramps
required.
Estimated Costs:
- Design: $125,000
- Right-of-Way
Acquisition: $80,000
- Construction: $600,000
Current
Status: In Design
Schedule:
- Design: Scheduled
to finish in summer 2022
- Right of way: Finish
acquisition spring 2023
- Construction:
Begin fall 2023
Contact Information:
- Design Project
Manager: Kevin Thomas tel (614) 645-6470
- Designer: GPD Inc.
- Contractor: To Be
Determined