Hocking and Hanover Signal Installation
Hocking and Hanover Signal Installation
DESCRIPTION
AND BENEFITS:
The project consists
of improvements at the intersection of Hocking Street at US33 and Hanover
Street at US33. At Hocking Street, the eastbound left turn on Long Street will
be widened to a double left turn lane. The intersection of Hocking at Spring
Street will be signalized. At Hanover Street, both Hanover at Long Street and
Hanover at Spring Street will be signalized. The eastbound left turn on Long
Street will be removed and the section of Hanover Street between Long Street
and Spring Street will be converted to one-way southbound. Hocking and Hanover
will be restriped between Spring Street and Nationwide Boulevard.
ESTIMATED
SCHEDULE:
Design: Fall 2019 – Fall 2021
Construction: Winter 2021/2022 – Winter 2022/2023
ESTIMATED COSTS:
Design: $180,000
Right-of-way acquisition: $0
Utility Relocation: $0
Construction: $1,546,735 ($1,000,000 provided by OPWC)
CONTACT INFORMATION
City of Columbus construction project manager:
Mike LaRowe, 614.645-606
City of Columbus design project manager: Steve Schmidt, P.E., (614) 645-3966
Designer: OHM Advisors Inc.
Construction contractor: Complete General Construction