Study Overview

W. Mound Street from Wayne Ave. to Central Ave. is planned to be resurfaced in 2024. Prior to resurfacing, a study will take place from December 2022 through August 2023 to assess traffic capacity to reduce vehicular travel lanes from four through lanes to two through lanes. The roadway configuration to be studied will consist of two vehicular travel lanes, a two-way center left turn lane, and bike lanes. This type of reconfiguration is typically referred to as a road diet, and can improve safety, calm traffic, and provide better access and mobility options for all roadway users (FHWA).

Public engagement efforts will include notifying directly impacted residents and businesses on the corridor and sharing information with COTA and the Greater Hilltop Area Commission. The final deliverable will be a pavement marking plan to restripe the roadway as part of the planned resurfacing project. Any proposed improvements will occur within the existing curb lines. This project will not include sidewalk replacement or utility relocation. 

The goal of this project is to improve safety for all roadway users and provide dedicated bike lanes that will connect to the existing neighborhood bikeways network on Whitethorne Ave. This section of W. Mound Street is on the City’s High Injury Network, meaning that the roadway has a higher density of vulnerable user crashes involving pedestrians, bicyclists, and motorcyclists. One of the goals of Vision Zero Columbus is to build safe streets for all users, by reducing speeds on the City’s High Injury Network and reconfiguring lanes to accommodate more modes of travel.

Public Engagement

An overview of the study was presented to the Greater Hilltop Area Commission’s Planning and Economic Development Committee on Thursday, March 23, 2023. Slides shared during that meeting can be found below in the documents tab.

The next presentation will take place at the Greater Hilltop Area Commission’s full meeting on Tuesday, May 2, 2023. The project team will be sharing proposed alternatives for W. Mound Street. The meeting is scheduled from 6:30 p.m. to 8:30 p.m. at the Columbus Metropolitan Library: Hilltop Branch, 511 S. Hague Ave. Columbus, OH 43204. This meeting is open to the public. 

Please share your feedback on the study by providing comments here

Documents

Mound Street Resurfacing Study Overview
Public Meeting Announcement Mound Street - May 2, 2023