CIP Right-of Way Plan Development

The following documents provide information regarding Right of Way Plan development requirements which promotes timely communication and cooperation between the Division of Design and Construction and the Consultant during the plan design stage. Early coordination is expected with the R/W coordinator to determine Proposed R/W, Easements and to identify Encroachments inside the R/W and disposition.

Columbus Right-of-Way Forum May 2019(PDF, 25MB)

Date and indicate plan type submission on all Right-of-Way submittals. All Right-of-Way plans shall follow the Ohio Department of Transportation (ODOT) Real Estate manual located at 3000 - Right-of-Way for plan format, with slight variations to the Right-of-Way Topo and Boundary sheets. See sample plans sheets.