Olentangy River Road SUP
This project will construct a
shared use path on Olentangy
River Road in two phases.
Phase
1:
Construction
of a 10 foot wide shared use path along the west side of Olentangy
River Road between Ackerman Road and North Broadway
Phase 2:
Construction
of a 10 foot wide shared use path along the west side of Olentangy
River Road between John Herrick Drive and Lane Avenue.
Work includes
signage, storm sewers, traffic signals, and curb ramp construction.
Schedule:
Phase1
(North):
Construction is complete.
Phase
2
(South): TBD
Cost:
Design,
right-of-way acquisition and utility relocation: $550,000
Construction and inspections: $2.0 million
Contact
Information:
Project manager: Jud Hines, P.E., tel. (614) 645-1512
Designer: EMH&T
Contractor:
Phase 1:
Complete General