Aerial View of Griggs

Contact Info Department of Public Utilities
Contact Directory

Walk-in Payment Office:
Temporarily Closed

After-hours Drop Box Available: 
111 N. Front Street
Columbus, Ohio 43215
Free short-term Parking
(garage across Long St) 
Directions
Public Utilities Customer Service Phone:
614-645-8276
Weekdays 7 am - 6 pm
Email: 
utilityleadrep@columbus.gov 


PUBLIC UTILITIES:



MOST REQUESTED:

BILL RELATED LINKS:

Receive Public Utilities Emails

Sign Up Through GovDelivery

GovDeliveryBubble

Stormwater capital improvement projects currently underway within the Division of Sewerage and Drainage

Linden Neighborhood Stormwater System Improvements

Linden Neighborhood Stormwater System Improvements This project will address street and back yard flooding, and reduce roadside drainage problems at five locations within/near the North Linden Community. To include 3,530 linear feet of 12-24" storm sewer pipe/bedding, manholes, catch basins, curb and gutter inlets, scour pool with rock channel protection and restoration, construction will start in spring 2021 and be completed in winter 2022. - learn more

Bethel Road Culvert Rehabilitation Project

Bethel Road Culvert Rehabilitation Project This project will rehabilitate an 84”stormwater culvert located under Bethel Road and rehabilitate 18” and 21” stormwater pipes under East Cooke Rd. Construction will start in spring 2020 and be completed by early 2021. - learn more

Holton Park and Eureka Avenue Green Infrastructure Improvements

Holton Park and Eureka Avenue Green Infrastructure Improvements Improvements include a green infrastructure, shallow-depth bioretention basin with a tiered-wall which will provide water quality treatment for area stormwater, preferrably at Holton Park in an existing open space area in the southeast corner. Pending approvals, construction will start in spring 2020 and be completed by early 2021. - learn more

Central Avenue Underpass Area Mao

Central Avenue Underpass Storm Sewer Improvements Project This project is to eliminate the flooding at the sag beneath the railroad overpass. Construction is anticipated to occur beginning in the fall of 2019. - learn more

Lehnert Farms Map

Lehnert Farms/Bolton Field Basin Improvements This project will modify the existing detention basin to provide additional flood control and reduce downstream flooding. Construction is anticipated to begin in mid 2019. - learn more

Summit View Detention Basin Improvements This project modify existing inlet and outlet, and replace grass area within the basin with native vegetation.  Construction is anticipated to begin in early 2019. - learn more

Windsor Avenue Project Map

Windsor Avenue Stormwater System Improvements This project will replace and rehabilitate existing structurally deficient storm pipe, meet current City of Columbus Stormwater Drainage Manual, and provide a watertight pipe to prevent zinc and cadmium leachate from entering the storm sewer. Construction is anticipated to begin in spring of 2018. - learn more

Holt Ave-Somersworth Dr Stormwater System Improvements Project Map

Holt Avenue / Somersworth Drive Stormwater System Improvements This project is to construct a new storm sewer system and replace existing storm sewer inlet catch basins. Proposed improvements will mitigate street and yard flooding. Pending final approval, construction will occur from summer 2018 thru fall of 2019. - learn more

Rathbone WPCLF Map

Rathbone Avenue Stormwater System Improvements This project will construct a new storm sewer system and re-build the existing roadway. The proposed stormwater system improvements will mitigate street flooding, yard flooding thereby improving the quality of life in this neighborhood. Pending final approval, construction will occur from spring 2018 thru fall of 2019. - learn more

Woodward Avenue Basin Project Map

Woodward Avenue Basin Improvements This project will modify the existing detention basin, modify existing inlet and outlet, and replace grass area with native vegetation. Construction is anticipated to begin in early 2018. - learn more