Stormwater capital improvement projects currently underway within the Division of Sewerage and Drainage
Linden Stormwater Improvements Phase 2 (Coronet)
This project will address roadway and yard flooding in the areas of: Coronet Drive, Ormond Avenue, Walmar Drive, Dawnlight Avenue, Framingham Circle, Northridge Road, Medina Avenue, and Oakland Park Avenue. Construction is expected to begin in late 2022 and be complete by spring 2024. Most improvements are a result of complaints and discussions with area residents and they will receive advance notice providing timing and contact info.
- learn more
Meeklynn Drive Sanitary and Storm Sewer Improvements Project
This project will construct both sanitary and storm sewer improvements along Meeklynn Drive and Olentangy River Road. These projects will be bid and constructed together but will have separate funding sources. Construction is anticipated to start early 2022.
- learn more
Old Beechwold Area Stormwater System Improvements
Located in Old Beechwold bounded by W Jeffrey Place on the north, High Street on the east, Rustic Place on the south and the Olentangy River on the west, this project will reduce street and yard flooding, replace 100 year old water mains, improve roadways, and provide detention and water quality improvement to rain water that will be redirected from the sanitary sewer system by future Blueprint projects.
- learn more
Fairwood Facilities Stormwater Improvements Project
Green infrastructure including bioretention basins, rain gardens, extended detention basin, and a porous parking area at the SMOC facility at 1250 Fairwood Avenue will improve water quality from storm runoff from the facility. Construction is expected to begin in late 2022 and last a year.
- learn more
Linden Neighborhood Stormwater System Improvements Phase 2
This project will address street and back yard flooding, and reduce roadside drainage problems at five locations within/near the North Linden Community. To include 3,530 linear feet of 12-24" storm sewer pipe/bedding, manholes, catch basins, curb and gutter inlets, scour pool with rock channel protection and restoration, construction will start late in 2022 or early 2023.
- learn more
Holton Park and Eureka Avenue Green Infrastructure Improvements
Improvements include a green infrastructure, shallow-depth bioretention basin with a tiered-wall which will provide water quality treatment for area stormwater, preferrably at Holton Park in an existing open space area in the southeast corner. Pending approvals, construction will start in spring 2020 and be completed by early 2021.
- learn more
Central Avenue Underpass Storm Sewer Improvements Project
This project is to eliminate the flooding at the sag beneath the railroad overpass. Construction is anticipated to occur beginning in the fall of 2019.
- learn more
Lehnert Farms/Bolton Field Basin Improvements
This project will modify the existing detention basin to provide additional flood control and reduce downstream flooding. Construction is anticipated to begin in mid 2019.
- learn more
Summit View Detention Basin Improvements
This project modify existing inlet and outlet, and replace grass area within the basin with native vegetation. Construction is anticipated to begin in early 2019.
- learn more
Holt Avenue / Somersworth Drive Stormwater System Improvements
This project is to construct a new storm sewer system and replace existing storm sewer inlet catch basins. Proposed improvements will mitigate street and yard flooding. Pending final approval, construction will occur from summer 2018 thru fall of 2019.
- learn more