Click here for more information on the Division of Fire notification.
The sanitary sewer system carries sewage from homes and businesses to the waste water treatment plants. Over time, pipes that make up this system have developed cracks and leaky joints that let rain water into the sanitary sewer, causing it to fill up beyond its capacity and overflow into rivers or back-up into basements. Foundation drains that connect directly to the sanitary sewer also contribute to the problem of rain water getting into the sanitary sewer.
Blueprint Columbus will stop rain water from entering the sanitary sewer system through lateral lining, roof water redirection and a voluntary sump pump program. That rain water will be directed to green infrastructure so it can filter through layers of stone, soil and plants before it slowly releases into the storm sewer system that empties into our rivers and streams.
For more information on the four pillars, please see:
Your browser does not support inline frames. Please visit https://www.youtube.com/embed/dAttw74KNQA?si=1Np5skAjBjN80LDh
Your browser does not support inline frames. Please visit https://www.youtube.com/embed/2fCfsphOgfc?si=a7h2Ujvcd6XP9e59
Your browser does not support inline frames. Please visit https://www.youtube.com/embed/pngTai99OZo?si=H-PxF7FcZKwJ9aNw
Your browser does not support inline frames. Please visit https://www.youtube.com/embed/vSIdPZWukJM?si=XPb5fpgHia063d0Z
Blueprint Columbus 910 Dublin Road Columbus, OH 43215
Office: 614-645-1253 Email: blueprint@columbus.gov
Learn how the City is eliminating sanitary sewer overflows.
Blueprint Columbus on YouTube