Dublin-Granville Road at Ulry Road Intersection Improvements
DESCRIPTION
AND BENEFITS:
The project will widen Dublin-Granville Road
at the intersection with Ulry Road to provide an eastbound left turn lane and a
westbound right turn lane. Dublin-Granville Road will also be widened and
reconstructed between Ulry and Old Hamilton Road to accommodate a two-way left
turn lane. Improvements will include the replacement of the existing strain
pole traffic signal, sidewalk, a Shared-Use-Path (SUP), street trees, curb,
storm sewer, and street lighting. Stormwater treatment will be required for the
project. The SUP will be extended to approximately 100' west of Conifer Drive
for a future tie-in to the Blendon Woods Metro Park.
ESTIMATED
SCHEDULE:
PHASE | START | FINISH |
Study |
Fall 2017
|
Late 2017
|
Design |
Late 2018
|
Early 2023
|
Right-of-Way |
Spring 2022
|
Spring 2023
|
Utility
Relocations |
Spring 2022
|
Summer 2022
|
Construction |
Fall 2023*
|
Summer 2024*
|
*Subject to funding approval by City Council
and weather conditions
ESTIMATED
COSTS:
PHASE | COST |
Study |
$50,000
|
Design |
$400,000
|
Right-of-Way |
$350,000
|
Construction |
$3.1 million
|
CONTACT
INFORMATION:
City of Columbus
Design Project Manager |
Hannah Webber, P.E., (614) 645-2859
|
Designer |
2LMN
|
Construction
contractor |
To be determined
|