Norton Road Shared Use Path - Camp Chase Railroad to Hall Road

Project Scope:

This project will construct a Shared-use path along the west side of Norton Road from The intersection of Hall Road south to connect to the Camp Chase Trail. 

Estimated Costs:

  • Design: $227,821
  • Right-of-Way Acquisition: $30,000
  • Construction: $655,000


Current Status: In Design


Schedule:

  • Design:  Scheduled to finish in spring 2020
  • Right of way: Finish acquisition summer 2020
  • Construction:  Begin fall 2020


Contact Information:

  • Design Project Manager:  Kevin Thomas tel (614) 645-6470
  • Designer: Michael Baker, Inc.
  • Contractor: To Be Determined