Refugee Road Shared Use Path over Big Walnut Creek

Project Scope: This project will construct a shared-use path along the north side of Refugee road just west of Big Walnut Creek and running to the east to the entrance of Nafzger Park.  Side walk will be constructed to connect between the driveway at Nafzger Park and Noe Bixby Road.  These improvements will be installed alongside Franklin County’s replacement of the bridge deck on the structure over Big Walnut Creek


Estimated Costs:

  • Design: $115,500
  • Right-of-Way Acquisition: $10,000
  • Construction: $800,000

Current Status: In Design


Schedule:

  • Design:  Scheduled to finish in spring 2020
  • Right of way: Finish acquisition summer 2020
  • Construction:  Begin summer 2021

Contact Information:

  • Design Project Manager:  Kevin Thomas tel (614) 645-6470
  • Designer: Korda
  • Contractor: To Be Determined