DESCRIPTION
AND BENEFITS:
This project consists of the design and
construction of pedestrian and bikeway improvements along Hiawatha Park Drive
from its southern terminus at the intersection with Silver Drive/Velma Avenue
south of I-71 to E. Hudson Street. A shared-use path will be added on the east
side of Hiawatha Park Drive within the project limits. Sidewalk will also be
added on the west side of Hiawatha Park Drive within the project limits
wherever sidewalk does not currently exist or is in disrepair.
ESTIMATED
SCHEDULE:
PHASE | START | FINISH |
Design |
Fall 2021
|
Spring 2023
|
Construction |
Early 2024*
|
Late 2024*
|
*Subject to funding approval by City Council
and weather conditions
ESTIMATED
COSTS:
PHASE | COST |
Design |
$250,000
|
Construction |
$2.0 million
|
CONTACT
INFORMATION:
City of Columbus
Design Project Manager |
Hannah Webber, P.E., (614) 645-2859
|
Designer |
Fishbeck, Thompson, Carr & Huber, Inc.
|
Construction
contractor |
To be determined
|