Fairwood Avenue Sidewalks-Wayland to Watkins
Description:
This project will install a
sidewalk on the east side of Fairwood Avenues from Wayland Drive to Watkins
Road. The project will include regrading between the roadway and sidewalk to
provide drainage for the proposed improvements. ADA compliant curb ramps will
also be provided at the intersections.
Cost:
- Design: $160,000
- Construction:
$975,000
Current
Status: Design
Schedule:
- Design: Summer
2015 to Spring 2017
- Construction:
Summer 2017 to Fall 2017
Contact
Information:
Design Project Manager: Kyle Hardy, Tel (614) 645-2732
Designer: PRIME AE Group
Contractor: TBD